Risk Assessment

This is our risk assessment sheet for our Niche News Opening Sequence - Ria


FILM PRODUCTION RISK ASSESSMENT






Example

Hazard
Persons who may be harmed
Property which may be damaged
Risk controls already in place
Risk Assessment LOW, MODERATE, HIGH, EXTREME
(see table next page)
Further action required to control risk ***
Hot sand underfoot on beach


Actors and crew
n/a
All actors and crew to wear shoes at all times

HIGH
When not involved in the shoot, actors and crew to have a shaded area in which to stand
Behaviour of dog
Actors and crew
Location
Dog will be on leash and supervised at all times and will not be left unattended.


MODERATE
Feeding, toilet, recreation and rest areas to be arranged for animal away from location premises
Burns from campfire
Actors and crew
Location
All actors and crew to sit at least 2 metres from fire.
Fire to be set at least 20 metres from property.
Fire extinguishers with trained operators on set.


HIGH
Advise local fire brigade



FILM PRODUCTION RISK ASSESSMENT



LIKELIHOOD
CONSEQUENCES
Insignificant
Minor
Moderate
Major
Catastrophic

Almost Certain


HIGH

HIGH

EXTREME

EXTREME

EXTREME

Likely


MODERATE

HIGH

HIGH

EXTREME

EXTREME

Moderate


LOW

MODERATE

HIGH

EXTREME

EXTREME

Unlikely


LOW

LOW

MODERATE

HIGH

EXTREME

Rare


LOW

LOW

MODERATE

HIGH

HIGH

Give careful consideration to the availability of information and ability to make contact in the event of problems.  Examples to consider:-

·        Is there mobile ‘phone reception in the area ?
·        How will you keep up to date with changes in the weather ?
·        How will you be informed of changes in tidal waters ?
·        How easy is it for members of the emergency services to reach you ? (cliffs, beaches, quarries, etc)


FILM PRODUCTION RISK ASSESSMENT

Company Name
                                                                                                                                                     CLSR
Production Title
CLSR News
Production Date(s) TBD
Producers Name
Caryss, Lauren, Sophia and Ria
Director Name CLSR
Date of Risk Assessment TBD

Risk Assessment conducted by Yomade Hundeyin


Hazard
Persons who may be harmed
Property which may be damaged
Risk controls already in place
Risk Assessment LOW, MODERATE, HIGH, EXTREME
(see table)
Further action required to control risk ***


Cars In the road


The whole group

The Camera
Walking on the pavement. Not filming on the main road.
Very Low
Be cautious and look left and right whilst walking
     Cars in the Car Park
The whole group
The camera
Walking around the sides and not filming in front of moving cars.
Very Low
Be cautious and look left and right whilst walking













Copy to additional sheet(s) if further space is needed

***Where further actions are required, complete the action plan on the following page
FILM PRODUCTION RISK ASSESSMENT

ACTION PLAN



Further action(s) required

By Whom
Date Completed

































FILM PRODUCTION RISK ASSESSMENT

Essential Contact Numbers

Emergency Services

Fire Brigade
999
Ambulance
999
Police
999
Coastguard
999
Transport Police
999
Chemist
999
Out of hours chemist
999
Veterinary Surgeon
999
Our of hours veterinary surgeon
999